Maintenance
kit (batteries maintenance
and maintenance)
1, the cell surface,
links and bolts should
be clean and dry to
maintain long-term.
If electrolyte application
of clean cotton yarn
to, and comprising dry-clean
water. Note : in the
cleansing process, no
access to tap water
batteries, to prevent
leakage and increase
self discharge, failure
to operate the vehicle.
2, the cells must maintain
good links. Regular
inspection of the cell
line initiative nut
or relaxed to avoid
spark or burn very pillars.
3, batteries placed
on the exclusion of
any goods, shall not
cathode battery is directly
linked to avoid short-circuit,
damage cells.
4, batteries discharged
after (whether vehicles
time and mileage), the
day must be charged,
not more than 24 hours
a day charging or charging.
Otherwise battery life
will be affected.
5, the use of batteries
in the process of the
electrolysis of water
in the electrolyte and
evaporation will rise
and cause density gauges
decline (especially
in the summer), it should
be constantly add electrolyte
or distilled water.
Batteries in the charging
terminal, or use distilled
water for the density
of 1.400-acid batteries
for Xiliusuan adjustment
electrolyte density
of 1.280+0.005 (25 degrees),
liquid line with the
highest reading level.
Adjusted to continue
charging 0.5-1 hours
to internal homogeneous.
6, batteries, not fall
into any impurities.
Plus water used to clean
equipment should be
maintained to avoid
impurities into the
cell.
7, if the vehicles do
not have long, full
of electricity, batteries
should be stored, and
every half a month to
a charge, charging time
about nine hours.
8, the useful life of
batteries generally
one to one and a half
hours, when the battery
capacity will be drastically
reduced, the time required
to replace batteries.
Must be the same brand,
same size, voltage similar
(with electricity, the
margin does not exceed
the maximum voltage
0.1V) batteries for
the group.
(controller maintenance
and maintenance) regular
maintenance
1, check whether the
contacts between good
contacts with contacts,
the availability of
conglutination, points
of contact have died
mechanical card
2, Inspection accelerator,
micro-switches communication,
the performance is definitely
good
3, inspection direction
switches communication,
performance is definitely
good
4, check electrical,
batteries are good links
between the group and
controls. Note : in
the case of electricity,
an inspection at least
three months in arrears.
Shun water rinse electrical
pieces! Can use brushes
or high pressure gas
removal.
|